Parkway Overlook – Baltimore, MD

Parkway Overlook – Baltimore, MD

  Parkway Overlook – Baltimore, MD   Access Demolition & Environmental was awarded the opportunity to tear down existing apartments located in Baltimore, MD.   The apartments, Parkway Overlook was a demolition and abatement project on 5 buildings &  Access was able to complete the task on time & within budget.                                   
Assisted Living Facility

Assisted Living Facility

Assisted Living Facility – Olney, MD   The Access Mold division had extreme work to do in this Assisted Living community. After many flooding occasions in these buildings, our mold team was brought in to perform exquisite remediation using almost all of our equipment inventory, as well as permanently removing some walls and flooring due to the extent of the water damage.                        .
The Standard – College Park, MD

The Standard – College Park, MD

  The Standard – College Park, MD   The Standard project was a student housing complex which included asbestos abatement before a complete tear down of the building. Our Roll-Off Recycling division was consistently on site to help remove debris. This job took a little over a month to complete and our team worked to tear down this complex by first demoing around the outside of the building and working our way to the.
Apartments 444 Lofts – Baltimore, MD

Apartments 444 Lofts – Baltimore, MD

  Apartments 444 Lofts – Baltimore, MD Provided a complete building razing & electrical disconnect package. This building was 4 stories with auditorium, 2 levels below grade & a bank vault with lead based paint. It required abatement services on the floor tile, pipe insulation & roof.
Jericho – Landover, MD

Jericho – Landover, MD

Jericho – Landover, MD Access Mold & Fire Restoration was awarded the opportunity to perform mold remediation on multiple units at Jericho in Hyattsville, MD.  Mold Remediation: Multiple 2000 M air scrubbers with negative pressure set up on multiple floors through out the building   HEPA sandwich technique was used 3 step cleaning process HEPA Vacuum> anti-microbial agent used> HEPA Vacuum Remove & dispose of Hazardous material outlined in IH report Removed affected drywall on.
Hilltop Apartments Fire & Mold – New Carrollton, MD

Hilltop Apartments Fire & Mold – New Carrollton, MD

Hilltop Apartments Fire & Mold – New Carrollton, MD This complex caught on fire September 2018, leaving over 100 people without a home. Access Demolition has been granted the chance to help be apart of the process in restoring the fire damage in these units.  Asbestos Abatement, Fire Damage Restoration & Mold Remediation: Provide notification & permit for ACM abatement Provide certified asbestos abatement supervisor & workers Provide certified mold remediators Remove & dispose of roof structure.
Ainger Place Apartments – Washington, DC

Ainger Place Apartments – Washington, DC

Ainger Place Apartments – Washington, DC   Demolition & Abatement of 45,000 SF Ainger Place Apartments for this Washington, DC tear down. Demolition & Abatement: Provide labor Wage Rates,  for raze demolition & abatement Provide First Source labor per contract Provide Section 3 labor for duration of project Provide equipment & material for raze demolition & abatement MEP’s made safe & capped by others Removal of MEP’s from building to existing main where capped Remove & dispose.
Culpepper Gardens – Arlington, VA

Culpepper Gardens – Arlington, VA

Culpepper Gardens – Arlington, VA Abatement of hazardous materials and demolition to a 150,000+ SF apartment building for Harkins Builders, Inc. Asbestos Abatement: Project Design Provide permits and notifications for abatement work Set up containment to state & EPA regulation Abate ACM as identified Kitchen ceilings, walls, partitions Window sills Drywall Floor tile & mastic Demolition: Mobilize manpower & equipment Provide daily reports Demo and remove bathroom tubs, fixtures, ceilings, floors & MEPs Wall.