Ainger Place Apartments – Washington, DC

 

Demolition & Abatement of 45,000 SF Ainger Place Apartments for this Washington, DC tear down.

Demolition & Abatement:

  • Provide labor Wage Rates,  for raze demolition & abatement
  • Provide First Source labor per contract
  • Provide Section 3 labor for duration of project
  • Provide equipment & material for raze demolition & abatement
  • MEP’s made safe & capped by others
  • Removal of MEP’s from building to existing main where capped
  • Remove & dispose of all PCB’s with waste manifest per EPA & RCRA guidelines
  • Remove existing sidewalk, pavement, brick walls, steps, fence, gravel parking lot 
  • Abate & remove hazardous material list in environmental report
  • Provide IH for area monitoring and final air clearance 
  • Remove and dispose of asbestos debris off site
  • Remove and dispose of generated construction debris off site
  • Provide closing documents to include waste manifest & air monitoring report

Access Demolition would like to thank Chiaramonte Construction Company, Ainger Place Associates & Bozzuto Construction Company for allowing us to work in DC again.  We look forward to working with you on future projects.

To watch this tear down Click the Link!