Assisted Living Facility

Assisted Living Facility

Assisted Living Facility – Olney, MD   The Access Mold division had extreme work to do in this Assisted Living community. After many flooding occasions in these buildings, our mold team was brought in to perform exquisite remediation using almost all of our equipment inventory, as well as permanently removing some walls and flooring due to the extent of the water damage.                        .
Research Lab – McLean, VA

Research Lab – McLean, VA

Research Lab – McLean, VA Removed and disposed of a two-story steel framed and concrete decked observation office inside of a functioning research laboratory for Genex Systems. Use of full negative pressure containment to ensure no dust contaminated the air within the facility.
Ellicott City Mold Remediation – Ellicott City, MD

Ellicott City Mold Remediation – Ellicott City, MD

Ellicott City Mold Remediation – Ellicott City, MD Mold remediation to multiple stores along Main Street after disastrous flooding. Mold Remediation: Removal of existing mold from rock and grout surfaces Disinfect with Shockwave chemical cleaner Use encapsulant to prevent future mold growth Provide negative air pressure during all removal activity Demo and remove water & debris damaged structures
Culpepper Gardens – Arlington, VA

Culpepper Gardens – Arlington, VA

Culpepper Gardens – Arlington, VA Abatement of hazardous materials and demolition to a 150,000+ SF apartment building for Harkins Builders, Inc. Asbestos Abatement: Project Design Provide permits and notifications for abatement work Set up containment to state & EPA regulation Abate ACM as identified Kitchen ceilings, walls, partitions Window sills Drywall Floor tile & mastic Demolition: Mobilize manpower & equipment Provide daily reports Demo and remove bathroom tubs, fixtures, ceilings, floors & MEPs Wall.
17th St Bank Vault – Washington, DC

17th St Bank Vault – Washington, DC

17th St Bank Vault – Washington, DC Existing PNC bank in high end office space located in Northeast Washington, DC. The 10 X 12 vault was 12” thick with 1” steel plate lined interior and roof. Due to space & noise restrictions, all work was performed at night. This vault was constructed on a pedestal area above street level which required additional planning and safety measures to ultimately remove the 7,500lb door.
Towson Town Center – Towson, MD

Towson Town Center – Towson, MD

Towson Town Center – Towson, MD 100,000 SF interior demolition of the Towson Town Circle shopping center for The Greenbench Companies. All existing interior finishes and existing slab on grade were removed for the renovation and installation of an underground parking structure. Demolition: Mobilize manpower & equipment Cut, cap & make safe electrical and water service Remove and dispose of stairs, elevators, equipment, escalator, railings, interior partitions, bathrooms, storefront, ceilings & lighting, floor finishes,.
The Berkeley Apartments – Arlington, VA

The Berkeley Apartments – Arlington, VA

The Berkeley Apartments – Arlington, VA Abatement of hazardous materials and complete tear down demolition of twin 5 story 80,000 SF apartment buildings, each building consisting of 137 units. Asbestos Abatement: Project Design Provide permits and notifications for abatement work Set up containment to state & EPA regulation Abate ACM as identified 613 friable pipe elbows 1,000 sq ft of duct sealant 73,200 sq ft of non-friable vinyl flooring & mastic Door caulk from.
Locust Point Library – Baltimore, MD

Locust Point Library – Baltimore, MD

Locust Point Library – Baltimore, MD Asbestos Abatement & Hazardous Material Removal: Provide complete interior abatement with removal of ACM floor tile, plaster walls, ceilings & leveling compound Remediation of mercury lamps & PCB ballast Demolition: Raze 3 buildings including footers & foundation Haul away debris & recycle appropriately Dust control provided by wet methods Execute work in a safe manner to avoid any hazards to the public or damage to the adjacent property
Il Palazzo Italian Embassy – Washington, DC

Il Palazzo Italian Embassy – Washington, DC

Il Palazzo Italian Embassy – Washington, DC Multi-million dollar contract to perform structural shoring, selective demolition, lead & asbestos abatement while preserving this historic century old Italian Embassy. Lead Paint Abatement: Project design Provide certified & trained lead workers/supervision Set up controlled work area by DDOE & EPA regulation Remove lead-based paint where identified Provide industrial hygienist service Provide manifests & closeout documents at completion of project Asbestos Abatement: Project Design Provide permits and.
Bay Bank Vault – Baltimore, MD

Bay Bank Vault – Baltimore, MD

Bay Bank Vault – Baltimore, MD Contracted by Bay Bank of Maryland to remove a 50-year-old concrete bank vault. The vault contained 200 SF of asbestos containing floor tile that was abated prior to demolition. We utilized an electric, remote controlled BROKK machine to break the 12” thick reinforced concrete walls and roof. The vault door weighed 7,500lbs and was carefully removed so no damage was caused to the surrounding construction.
Belcrest Plaza – Hyattsville, MD

Belcrest Plaza – Hyattsville, MD

Belcrest Plaza – Hyattsville, MD Complete demolition of seven apartment buildings totaling 120,000 SF for Percontee, Inc Asbestos Abatement: Project Design Provide permits and notifications for abatement work Set up containment to state & EPA regulation Abate ACM as identified Floor tile 100,000+ SF Drywall/joint compound 150,000+ SF Window caulking Demolition: Mobilize manpower & equipment Provide daily reports & equipment logs Provide hydrant tap and permit for dust control Demolish existing apartment buildings, including.
Haussner’s Restaurant – Baltimore, MD

Haussner’s Restaurant – Baltimore, MD

Haussner’s Restaurant – Baltimore, MD Abatement of hazardous materials and complete demolition of historic 42,000 SF building that was home to the famous Haussner’s Restaurant in Baltimore. Asbestos Abatement: Project Design Provide permits and notifications for abatement work Set up containment to state & EPA regulation Abate ACM as identified Demolition: Mobilize manpower & equipment Provide daily reports & equipment logs Provide hydrant tap and permit for dust control Demolish existing apartment buildings, including.