Tiffany & Co. – Palm Beach, FL

Tiffany & Co. – Palm Beach, FL

Tiffany & Co. – Palm Beach, FL   Access Demolition was called to Palm Beach, FL to assist in the renovation of Tiffany & Co.  The interior & exterior demolition of this project will be completed through approx. 4-5 mobilizations.   Demolition: Demo & Remove 1st floor lobby drywall partitions & masonry wall Demo & Remove entry foyer drywall, window, tile flooring & drywall ceiling Demo & Remove select drywall throughout & ACT ceiling  Demo.
PM Pediatrics – Parkville, MD

PM Pediatrics – Parkville, MD

PM Pediatrics – Parkville, MD Access Contracting Group was offered the opportunity to perform in interior gut in Parkville, MD to make way for a new PM Pediatrics coming soon. Demolition: Mobilize manpower and equipment  Demo & remove ACT ceiling tiles & grids Demo & remove carpet, VCT flooring Demo & remove non load bearing, GWB wood & metal framed partitions Demo & remove doors & frames Demo & remove 112 SF of CMU.
Chipotle – Oxon Hill, MD

Chipotle – Oxon Hill, MD

Chipotle – Oxon Hill, MD   Access Demolition was awarded the opportunity to complete  demolition to make way for a brand new Chipolte in Oxon Hill, MD.  Demolition: Mobilize manpower & equipment Demo & remove 11′ GWB, non load bearing partitions  Demo & remove ACT ceiling tile, grid, lights & diffusers Demo & remove casework, wall studs, doors & frames Demo & remove signage at roof parapet wall  Demo & remove electrical panel Demo.
Aldi – Multiple Locations

Aldi – Multiple Locations

Aldi – Multiple Locations Access Demolition has been awarded five Aldi projects, thus far.  Each projects has had a different scope of work, which Access has taken on while finishing on time & within budget.  We would like to thank everyone who has given us the opportunity to work at the following locations: Aldi – Clinton, MD – Integrated Properties Aldi – Baltimore, MD – Teel Construction Aldi – Oxon Hill, MD – Teel.
YMCA – Multiple locations

YMCA – Multiple locations

YMCA – Multiple locations Access Demolition has completed demolition on 3 YMCA’s.  Each project with a different scope of work.   YMCA – Arnold, MD YMCA, Main Bldg – Arnold, MD YMCA Weinburg – Baltimore, MD Demolition: Mobilize manpower & equipment Demo & remove carpet flooring, tile flooring & portions of flooring adhesives  Demo & remove existing GWB partitions as indicated, reception desk, concrete/pan deck stairs & railings & suspended bulkhead/ceiling system Demo & remove.
Target – Multiple Locations

Target – Multiple Locations

Target – Multiple Locations Access Demolition has completed several Target’s within the Mid-Atlantic Region.   We are proud to have worked with both Groom Construction & L.F. Jennings to complete the following Target demolition projects. Target Gaithersburg – Groom Construction Target Washington, DC – Groom Construction Target Forestville – L.F. Jennings Target Georgia & Eastern – L.F. Jennings Demolition: Each location has a different Scope of Work, below is a general list of things we.
McDonald’s – Multiple Locations

McDonald’s – Multiple Locations

McDonald’s – Multiple Locations Access Demolition has completed several McDonald’s within the Mid-Atlantic Region.  We are proud to have worked with multiple general contractors to get the job done. McDonald’s 18th Street – Venture Construction McDonald’s Millersville – Venture Construction McDonald’s Solomons – Venture Construction McDonald’s Belair Rd – Venture Construction McDonald’s Olney – Venture Construction McDonald’s Germantown – Venture Construction McDonald’s Silver Spring – Venture Construction McDonald’s Vienna – Venture Construction McDonald’s Linthicum.
Finish Line – Arlington, VA

Finish Line – Arlington, VA

Finish Line – Arlington, VA Successful gut of an existing Finish Line retail store in the Pentagon City Mall. All existing interior finishes and storefront were removed to make way for a new store. Demolition: Mobilize manpower & equipment Remove existing drywall partitions, doors/frames, ACT ceilings, millwork, columns, flooring, storefront, & MEP’s All work done on off hours in one phase
Towson Town Center – Towson, MD

Towson Town Center – Towson, MD

Towson Town Center – Towson, MD 100,000 SF interior demolition of the Towson Town Circle shopping center for The Greenbench Companies. All existing interior finishes and existing slab on grade were removed for the renovation and installation of an underground parking structure. Demolition: Mobilize manpower & equipment Cut, cap & make safe electrical and water service Remove and dispose of stairs, elevators, equipment, escalator, railings, interior partitions, bathrooms, storefront, ceilings & lighting, floor finishes,.