COVID-19 Disinfecting Services Access Environmental has been called in to disinfect multiple sites throughout the Mid-Atlantic Region to help fight the COVID-19 pandemic.  We can provide disinfecting services to all our customers while following all the recommendations provided by WHO, the CDC and the EPA.   Call or Email us today to discuss our disinfecting services for your facilities. 443.692.6213 Estimating@accessdemolition.com
N-9 Parking Structure – NSA

N-9 Parking Structure – NSA

N-9 Parking Structure Dismantle – NSA   Access Contracting Group was awarded the opportunity to dismantle a Parking structure for the National Security Agency through the General Contractor Chugach Government Solutions.  This project was completed in 30 days instead of the 60 days given to us. Thank you, Chugach, for allowing us to complete this project  and we look forward to working with you in the future. Demolition: Mobilize manpower & equipment Install temporary.
Ports America – Baltimore, MD

Ports America – Baltimore, MD

Ports America – Baltimore, MD Access Demolition was awarded the opportunity to decommission, breakdown & recycling of 5 existing forklifts using a shear excavator. 
The Willows – Pennsylvania

The Willows – Pennsylvania

The Willows – Pennsylvania  Access Contracting Group helped renovate this former manufacturing plant, built between 1880-1970, to become the future home of 70 apartments in Pennsylvania. Our divisions, Access Demolition & Environmental/Access Shoring Technologies performed this work for Mayoka Services & Ingerman. ACG tore down unnecessary garages, abated all asbestos & lead containing materials, thoroughly cleaned all floors of existing debris, chemicals, drums, pallets, etc, & removed multiple storage tanks. Shoring was engineered &.
Keysight – Chantilly, VA

Keysight – Chantilly, VA

Keysight – Chantilly, VA   In Chantilly, VA,  Access Demolition was awarded the opportunity to decommission a data center & remove a steel structure by CPI.  This project was completed during off hours & in one phase/mobilization.   Demolition: Mobilize manpower & equipment Provide licensed electrician to make safe all electrical service to data room & associated equipment Remove & recycle steel structure reinforcement on 2nd floor Install temporary floor protection each shift & temporary.
Hilltop Apartments Fire & Mold – New Carrollton, MD

Hilltop Apartments Fire & Mold – New Carrollton, MD

Hilltop Apartments Fire & Mold – New Carrollton, MD This complex caught on fire September 2018, leaving over 100 people without a home. Access Demolition has been granted the chance to help be apart of the process in restoring the fire damage in these units.  Asbestos Abatement, Fire Damage Restoration & Mold Remediation: Provide notification & permit for ACM abatement Provide certified asbestos abatement supervisor & workers Provide certified mold remediators Remove & dispose of roof structure.
The Wharf – Washington, DC

The Wharf – Washington, DC

The Wharf – Washington, DC   Structural Shoring: Provide shoring support in underground parking garage in order to mobilize heavy equipment Underground parking garage to stay Demolition: Demolish existing waterfront hotel Haul away debris & recycle appropriately Dust control provided by suppression mister Provide debris screen for dust control on waterfront side of building Execute work in a safe manner to avoid any hazards to the public or damage to the adjacent properties &.
Aldi Shoring- Martinsburg, WV

Aldi Shoring- Martinsburg, WV

Aldi Shoring – Martinsburg, WV Demolition:  Remove existing flooring, partitions, restrooms, dock leveler system, bollards, casework, MEPs, portion of roof membrane, roof deck/joists, stair case system  Change order to provide demolition to concrete wall panels (photos attached) Installed pole bracing to support tilt wall system Sawcut precast panels into manageable pieces Coordinate rigging & crane lifts
Research Lab – McLean, VA

Research Lab – McLean, VA

Research Lab – McLean, VA Removed and disposed of a two-story steel framed and concrete decked observation office inside of a functioning research laboratory for Genex Systems. Use of full negative pressure containment to ensure no dust contaminated the air within the facility.
Pentagon City Fashion Center – Arlington, VA

Pentagon City Fashion Center – Arlington, VA

Pentagon City Fashion Center – Arlington, VA Demolition: Mobilize manpower & equipment Provide daily reports & equipment logs Provide all employee certification in fall protection mobile platform, confined space awareness, OSHA 10, power tools, equipment operations Provide dust control Demolish existing food court Demolish existing escalators & elevators Sawcut and remove existing planters Demolish restroom corridors Sawcut and remove slab on deck at elevator landing Remove all wall railings per plans Remove storefront at.
17th St Bank Vault – Washington, DC

17th St Bank Vault – Washington, DC

17th St Bank Vault – Washington, DC Existing PNC bank in high end office space located in Northeast Washington, DC. The 10 X 12 vault was 12” thick with 1” steel plate lined interior and roof. Due to space & noise restrictions, all work was performed at night. This vault was constructed on a pedestal area above street level which required additional planning and safety measures to ultimately remove the 7,500lb door.
Il Palazzo Italian Embassy – Washington, DC

Il Palazzo Italian Embassy – Washington, DC

Il Palazzo Italian Embassy – Washington, DC Multi-million dollar contract to perform structural shoring, selective demolition, lead & asbestos abatement while preserving this historic century old Italian Embassy. Lead Paint Abatement: Project design Provide certified & trained lead workers/supervision Set up controlled work area by DDOE & EPA regulation Remove lead-based paint where identified Provide industrial hygienist service Provide manifests & closeout documents at completion of project Asbestos Abatement: Project Design Provide permits and.
Bay Bank Vault – Baltimore, MD

Bay Bank Vault – Baltimore, MD

Bay Bank Vault – Baltimore, MD Contracted by Bay Bank of Maryland to remove a 50-year-old concrete bank vault. The vault contained 200 SF of asbestos containing floor tile that was abated prior to demolition. We utilized an electric, remote controlled BROKK machine to break the 12” thick reinforced concrete walls and roof. The vault door weighed 7,500lbs and was carefully removed so no damage was caused to the surrounding construction.