Parkway Overlook – Baltimore, MD

Parkway Overlook – Baltimore, MD

  Parkway Overlook – Baltimore, MD   Access Demolition & Environmental was awarded the opportunity to tear down existing apartments located in Baltimore, MD.   The apartments, Parkway Overlook was a demolition and abatement project on 5 buildings &  Access was able to complete the task on time & within budget.                                   
Assisted Living Facility

Assisted Living Facility

Assisted Living Facility – Olney, MD   The Access Mold division had extreme work to do in this Assisted Living community. After many flooding occasions in these buildings, our mold team was brought in to perform exquisite remediation using almost all of our equipment inventory, as well as permanently removing some walls and flooring due to the extent of the water damage.                        .
The Standard – College Park, MD

The Standard – College Park, MD

  The Standard – College Park, MD   The Standard project was a student housing complex which included asbestos abatement before a complete tear down of the building. Our Roll-Off Recycling division was consistently on site to help remove debris. This job took a little over a month to complete and our team worked to tear down this complex by first demoing around the outside of the building and working our way to the.
College Park Gateway – College Park, MD

College Park Gateway – College Park, MD

College Park Gateway – College Park, MD Access Contracting Group helped clear the way for exciting new developments at College Park .  Our divisions Access Demolition & Environmental/Access Concrete Cutting & Coring performed this work for Bozzuto Construction Company.   ACG abated all asbestos containing material from two buildings before tearing them down.  Concrete & asphalt was removed including concrete slabs, below grade walls, footings, & all existing paving. Thank you for this opportunity, Bozzuto.
Thurgood Marshall School – Washington, DC

Thurgood Marshall School – Washington, DC

Thurgood Marshall School – Washington, DC Access Demolition & Environmental was awarded the opportunity to tear down an existing school located in Washington, DC.   The abandoned building, Thurgood Marshall School, was approximately 150,000 SqFt &  Access was able to complete the task on time & within budget. 
The Strand – Washington, DC

The Strand – Washington, DC

The Strand – Washington, DC Access Demolition & Environmental was awarded the opportunity to tear down an existing building located in Washington, DC.   The abandoned building, The Strand, had abatement services that needed to be completed before the demolition of the building could occur.  Access was able to complete the task on time & within budget.   Demolition/Abatement: Provide 10 day abatement notification and permit for asbestos removal Mobilize manpower & equipment  Install & maintain.
Good Shepherd Church – Catonsville, MD

Good Shepherd Church – Catonsville, MD

Good Shepherd Church – Catonsville, MD Access Contracting Group was awarded the opportunity to raze this out of use church/funeral home located in Catonsville, MD for Good Shepherd Church. Demolition: Mobilize manpower & equipment Demolish existing structure (2 story – approx. 6200 SF with basement) Separate & recycle debris to the fullest extent possible Transport & dispose of all debris generated to approved facility  Provide hydrant tap & permit for water usage during demolition.
Apartments 444 Lofts – Baltimore, MD

Apartments 444 Lofts – Baltimore, MD

  Apartments 444 Lofts – Baltimore, MD Provided a complete building razing & electrical disconnect package. This building was 4 stories with auditorium, 2 levels below grade & a bank vault with lead based paint. It required abatement services on the floor tile, pipe insulation & roof.
Tease Me Salon – Towson, MD

Tease Me Salon – Towson, MD

Tease Me Salon – Towson, MD Access Contracting Group was awarded the opportunity by Whiting-Turner to tear down the existing Tease Me Salon located in Towson, MD.    Demolition: Mobilize manpower and equipment  Obtain necessary permits Make safe all electrical, plumbing and mechanical lines Demolish existing building Transport debris to approved landfill/recycling center Utilize fire hydrant tap/permit for dust control Remove & recycle debris to fullest extent Remove & recycle concrete slabs/footers/foundations Work to.
MegaMart – Gaithersburg, MD

MegaMart – Gaithersburg, MD

MegaMart – Gaithersburg, MD Access Demolition was awarded the opportunity to completely  tear down an existing building in Gaithersburg, MD to make way for a new MegaMart. Demolition: Provide permit for tear down of building Provide & install construction fence around building  Provide & install 18” Filter Log & inlet protection Mobilize manpower & equipment Demolish existing two story building, Approx. 24,000 SF Separate & recycle debris to fullest extent possible Transport all debris.
The Willows – Pennsylvania

The Willows – Pennsylvania

The Willows – Pennsylvania  Access Contracting Group helped renovate this former manufacturing plant, built between 1880-1970, to become the future home of 70 apartments in Pennsylvania. Our divisions, Access Demolition & Environmental/Access Shoring Technologies performed this work for Mayoka Services & Ingerman. ACG tore down unnecessary garages, abated all asbestos & lead containing materials, thoroughly cleaned all floors of existing debris, chemicals, drums, pallets, etc, & removed multiple storage tanks. Shoring was engineered &.
Industrial Printing Warehouse Tear Down – Woodlawn, MD

Industrial Printing Warehouse Tear Down – Woodlawn, MD

Industrial Printing Warehouse Tear Down -Woodlawn, MD Northpoint Development awarded Access Demolition & Environmental Services the opportunity to tear down an existing 55,000 SF precast (Tilt-up wall) warehouse building in Woodlawn, MD. Demolition: Mobilize manpower and equipment  Demolish existing building Separate & recycle debris to fullest extent possible Remove & recycle concrete slabs, footers & foundation Remove & dispose of canopies, site walls & other elements directly abutting the building Remove asphalt parking lot.
Ainger Place Apartments – Washington, DC

Ainger Place Apartments – Washington, DC

Ainger Place Apartments – Washington, DC   Demolition & Abatement of 45,000 SF Ainger Place Apartments for this Washington, DC tear down. Demolition & Abatement: Provide labor Wage Rates,  for raze demolition & abatement Provide First Source labor per contract Provide Section 3 labor for duration of project Provide equipment & material for raze demolition & abatement MEP’s made safe & capped by others Removal of MEP’s from building to existing main where capped Remove & dispose.
The Wharf – Washington, DC

The Wharf – Washington, DC

The Wharf – Washington, DC   Structural Shoring: Provide shoring support in underground parking garage in order to mobilize heavy equipment Underground parking garage to stay Demolition: Demolish existing waterfront hotel Haul away debris & recycle appropriately Dust control provided by suppression mister Provide debris screen for dust control on waterfront side of building Execute work in a safe manner to avoid any hazards to the public or damage to the adjacent properties &.
The Berkeley Apartments – Arlington, VA

The Berkeley Apartments – Arlington, VA

The Berkeley Apartments – Arlington, VA Abatement of hazardous materials and complete tear down demolition of twin 5 story 80,000 SF apartment buildings, each building consisting of 137 units. Asbestos Abatement: Project Design Provide permits and notifications for abatement work Set up containment to state & EPA regulation Abate ACM as identified 613 friable pipe elbows 1,000 sq ft of duct sealant 73,200 sq ft of non-friable vinyl flooring & mastic Door caulk from.
Locust Point Library – Baltimore, MD

Locust Point Library – Baltimore, MD

Locust Point Library – Baltimore, MD Asbestos Abatement & Hazardous Material Removal: Provide complete interior abatement with removal of ACM floor tile, plaster walls, ceilings & leveling compound Remediation of mercury lamps & PCB ballast Demolition: Raze 3 buildings including footers & foundation Haul away debris & recycle appropriately Dust control provided by wet methods Execute work in a safe manner to avoid any hazards to the public or damage to the adjacent property
Belcrest Plaza – Hyattsville, MD

Belcrest Plaza – Hyattsville, MD

Belcrest Plaza – Hyattsville, MD Complete demolition of seven apartment buildings totaling 120,000 SF for Percontee, Inc Asbestos Abatement: Project Design Provide permits and notifications for abatement work Set up containment to state & EPA regulation Abate ACM as identified Floor tile 100,000+ SF Drywall/joint compound 150,000+ SF Window caulking Demolition: Mobilize manpower & equipment Provide daily reports & equipment logs Provide hydrant tap and permit for dust control Demolish existing apartment buildings, including.
Haussner’s Restaurant – Baltimore, MD

Haussner’s Restaurant – Baltimore, MD

Haussner’s Restaurant – Baltimore, MD Abatement of hazardous materials and complete demolition of historic 42,000 SF building that was home to the famous Haussner’s Restaurant in Baltimore. Asbestos Abatement: Project Design Provide permits and notifications for abatement work Set up containment to state & EPA regulation Abate ACM as identified Demolition: Mobilize manpower & equipment Provide daily reports & equipment logs Provide hydrant tap and permit for dust control Demolish existing apartment buildings, including.