Children’s National at Samuel Kelsey – Washington, DC
Access Demolition was awarded the opportunity to work inside Samuel Kelsey getting it ready for Children’s National. Our scope of work consisted of Demolition & Lead & Asbestos Abatement.
Demolition:
- Mobilize manpower & equipment
- Demo & remove walls, counter tops, cabinets, plywood work tables, stud wall, drywall & flooring mastic
- Demo & remove duct work & mechanical equipment
- Provide dumpster for waste & remove all debris generated at site
Asbestos Abatement:
- Submit notification to DOEE & EPA for removal of asbestos containing material
- Provide asbestos abatement labor
- Provide equipment & material for asbestos abatement
- Setup containment per EPA & OSHA regulations & guidelines for the disturbance of asbestos containment material
- Abate & remove hazardous material identified in Axiom Report
- 9″x 9″ floor tile
- Pipe fitting & air cell insulation
- Black sealant on duct at entry to wall
- Remove & dispose of asbestos debris
Lead Abatement:
- Submit notifications to DOEE for removal of asbestos containing material
- Provide lead abatement labor
- Provide equipment & material lead abatement via bead blast
- Setup containment per EPA & OSHA regulations & guidelines for the disturbance of asbestos containment material
- Abate & remove hazardous material identified in Axiom Report
- Lead base paint throughout
- Plaster ceiling where indicated
- Drywall & plaster to structural around columns
- Remove & dispose of asbestos debris