The Berkeley Apartments – Arlington, VA
Abatement of hazardous materials and complete tear down demolition of twin 5 story 80,000 SF apartment buildings, each building consisting of 137 units.
Asbestos Abatement:
- Project Design
- Provide permits and notifications for abatement work
- Set up containment to state & EPA regulation
- Abate ACM as identified
- 613 friable pipe elbows
- 1,000 sq ft of duct sealant
- 73,200 sq ft of non-friable vinyl flooring & mastic
- Door caulk from rooftop doors
Demolition:
- Mobilize manpower & equipment
- Provide daily reports & equipment logs
- Provide hydrant tap and permit for dust control
- Demolish existing apartment buildings, including slabs, footers, and foundation
- Separate and recycle debris to fullest extent possible (by weight 77% of waste stream diverted from landfills)
- Transport all debris generated to approved disposal/recycling facilities
- Provide certified traffic control for trucks and equipment on and off site
- Maintain clean site and street
- Rough grade for positive runoff