YMCA – Multiple locations
Access Demolition has completed demolition on 3 YMCA’s. Each project with a different scope of work.
- YMCA – Arnold, MD
- YMCA, Main Bldg – Arnold, MD
- YMCA Weinburg – Baltimore, MD
Demolition:
- Mobilize manpower & equipment
- Demo & remove carpet flooring, tile flooring & portions of flooring adhesives
- Demo & remove existing GWB partitions as indicated, reception desk, concrete/pan deck stairs & railings & suspended bulkhead/ceiling system
- Demo & remove brick pavers, doors & frames, ACT ceiling, drywall, CMU/brick wall sections & interior & exterior stairs
- Demo & remove steel column
- Demo & remove portion of existing roof/parapet, non-structural angled piers & store front system
- Saw cut & remove 6″ max depth concrete & excavate for openings
- excavate & export soils to rough finish elevation